BCR: Peru's construction sector up 7.1% in July due to public works

Construction sector activity increased 7.1% year-on-year in July due to the greater progress of public works, the Central Reserve Bank (BCR) reported on Monday.
Publicado: 23/9/2024
The BCR specified that, given this result, the activity advanced 4.5% in the first seven months of 2024 compared to the same period in 2023.
Dynamism
The Central Reserve Bank also detailed that, in the seventh month of this year, the progress of public works increased by 30.6% due to greater investment from the central government, as well as from regional and local ones.
By type of works, investment increased in the construction of non-residential buildings, risk prevention works, basic services, and road infrastructure.
Cement consumption
For its part, domestic cement consumption decreased by 0.5% in July due to lower demand in the Peruvian north and south.
On the other hand, Unacem shipments increased by 2.7% due to higher bulk shipments, which grew by 20.2%.
(END) NDP/SDD/MVB
Publicado: 23/9/2024
Las más leídas
-
Fonavi 2025: verifica en este link si eres beneficiario del tercer grupo de reintegro
-
Nuevo aeropuerto Jorge Chávez: ingreso será exclusivamente por la av. Morales Duárez
-
Papa León XIV: el odontólogo del papa y la afición de Robert Prevost por la carne de cuy
-
¿Buscas empleo en el nuevo Jorge Chávez? Conoce los perfiles requeridos y postula aquí
-
¿Es momento de comprar casa o departamento? Esto dicen los expertos
-
Nuevo Jorge Chávez: así funciona el prerregistro para agilizar control migratorio [video]
-
Murió el gran tenor peruano Luis Alva en Milán
-
Alianza Lima cae 2-0 ante Talleres y se despide de la Copa Libertadores
-
Fiscalía logra detención internacional de Miguel Rodríguez, alias "Cuchillo"
-
Perú: inauguran primera planta fotovoltaica para la industria cementera