BCR: Peru's construction sector up 7.1% in July due to public works

Construction sector activity increased 7.1% year-on-year in July due to the greater progress of public works, the Central Reserve Bank (BCR) reported on Monday.
Publicado: 23/9/2024
The BCR specified that, given this result, the activity advanced 4.5% in the first seven months of 2024 compared to the same period in 2023.
Dynamism
The Central Reserve Bank also detailed that, in the seventh month of this year, the progress of public works increased by 30.6% due to greater investment from the central government, as well as from regional and local ones.
By type of works, investment increased in the construction of non-residential buildings, risk prevention works, basic services, and road infrastructure.
Cement consumption
For its part, domestic cement consumption decreased by 0.5% in July due to lower demand in the Peruvian north and south.
On the other hand, Unacem shipments increased by 2.7% due to higher bulk shipments, which grew by 20.2%.
(END) NDP/SDD/MVB
Publicado: 23/9/2024
Las más leídas
-
Mercado Mayorista de Lima pondrá en subasta pública arrendamiento de 60 puestos
-
Frío extremo en el sur: prevén registros de 14 grados bajo cero este jueves 5 y viernes 6
-
Lapadula y Kenji Cabrera quedan fuera de la selección para choques con Colombia y Ecuador
-
¡Con sello arequipeño! Universitarios diseñan prototipo de perro robot con IA
-
Lava Jato: presentan acusación contra Ollanta Humala por Gasoducto Sur Peruano
-
¡Atención, taxistas! El 14 de junio vence plazo para pintar autos de color amarillo
-
Dictan detención preliminar de 15 días para madre del “Monstruo”
-
Seguro Agrícola otorgó más de S/ 8 millones a productores de Ayacucho
-
Evento gratuito en Tacna promoverá normas de calidad para aceite de oliva
-
Eduardo Arana: ciudadanía debe tener certeza que haremos uso austero de recursos públicos